Contact

View of the construction of a modern building

ABC Medical -
Laval, QC

2,600 sq. ft. clinic delivered on a tight timeline, custom millwork.

ABC Clinique Sante - Boucherville, QC

2,600 sq. ft. clinic delivered on a tight timeline, custom millwork.

Project Highlights

Client Type

Health and Wellness Clinic

Size

2,600 sq. ft.

Scope

Construction + Custom Cabinetry

Timeline

Delivered in 8 Weeks

Challenge

Tight Move-In Deadline

Proof

Video Testimonial From Client

ABC Medical –
LAVAL, QC

A full design-build project for a 2,600 sq. ft. medical clinic combining chiropractic, physio, massage therapy, and nutrition services. Located on Rue Ampère in Boucherville, this was the client’s second location — four times larger than her original space. Delivered on schedule with custom cabinetry and no room for error. 

A full design-build project for a 2,600 sq. ft. medical clinic combining chiropractic, physio, massage therapy, and nutrition services. Located on Rue Ampère in Boucherville, this was the client’s second location — four times larger than her original space. Delivered on schedule with custom cabinetry and no room for error. 

Timeline

Phase

Duration

Finalizing design, preparing architectural and engineering plans, and securing municipal permit approval. 

Planning & Permits Collapse

8-10 weeks

On-site execution of the build — including demolition, framing, mechanical/electrical/plumbing, finishes, and millwork. 

Construction Collapse

8 weeks

Inspections, final adjustments, professional cleaning, and handover of the space. 

Final Touches Collapse

1 week

Budget

Division

Budget ($/sqft)

Filing your construction permit with the city and covering related municipal fees. 

Division Permit Filing & Municipal Fees Collapse

$1-$2

Removing old walls, flooring, or fixtures to prepare for new construction. 

Demolition (If Applicable) Collapse

$3-$5

Updating or adding fire sprinklers to meet building code and safety rules. 

Sprinklers Collapse

$4-$6

Installing or modifying fire alarm devices and wiring for code compliance. 

Fire Alarm Collapse

$3-$5

Heating, cooling, and ventilation systems, including ductwork or units. 

HVAC Collapse

$7-$10

Water lines, drains, and connections for sinks, bathrooms, or equipment. 

Plumbing Collapse

$5-$7

All wiring, outlets, lighting, and electrical panels needed for the space. 

Electrical Collapse

$18-$22

Building interior walls, ceilings, and door frames (usually with drywall). 

Interior Systems (Walls, Ceilings, Doors) Collapse

$35-$40

All floor finishes — vinyl, tile, wood, or carpet — including prep work. 

Flooring Collapse

$10-$12

Painting of all interior surfaces, including walls, ceilings, and trim. 

Painting Collapse

$6-$8

Built-in cabinetry, desks, reception counters, or storage — designed to fit your space. 

Custom Millwork Collapse

$25-$30

All installed counters — in exam rooms, kitchens, reception, or bathrooms. 

Countertops Collapse

$6-$8

Loose furniture (chairs, desks, exam tables), appliances, and small equipment. 

Furniture, Fixtures & Equipment Collapse

$10-$20

Interior and exterior signs, vinyl lettering, or wayfinding displays. 

Signage(Indoor/Outdoor) Collapse

$2-$4

Data cabling, internet hookups, entry card systems, and security cameras. 

IT / Access Control / Security Collapse

$2-$5

Builder’s insurance and liability coverage during the construction period. 

Insurance Collapse

$2-$3

A full-time lead on-site managing trades, quality, and daily coordination. 

Site Superintendent Collapse

$5-$7

Our team overseeing the full project: planning, schedules, scope, and quality. 

Project Management Collapse

$10-$12

Back-office work: budgeting, communication, documentation, and vendor coordination. 

Administration Collapse

$4-$6

Layout and construction drawings prepared by an architect for permit and build. 

Architectural Plans Collapse

$4-$6

Materials, finishes, and visual design choices created by a designer. 

Interior Design Collapse

$5-$7

Engineering plans for HVAC, plumbing, and electrical systems. 

Mechanical & Electrical Engineers Collapse

$4-$5

engineer sketching building project on a blueprint with a pencil b

Budget and timeline by email in 3 business days

Takes about 2 minutes. No call needed.

  1. Choose Offices or Clinics
  2. Answer a few questions
  3. Budget and timeline by email

Greater Montréal only • Minimum size: 1,000 ft² • Prices in Canadian dollars

Cromebloc
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.